Plumbing Permits and Inspections
Projects that Require a Plumbing Permit
Plumbing permits are required for the following projects:
- Installing any new piping or fixtures.
- Replacing any plumbing pipe, such as hot and cold water supply, county water and sewer connections, well connections, septic tank connections and drainage piping.
- Installing lawn irrigation backflow prevention device.
When to Schedule a Plumbing Permit Inspection
- Plumbing Slab - After the piping is installed and tested, and before the piping is backfilled or concealed
- Plumbing Rough - After all the piping that is to be concealed is installed and tested, and before the insulation and wall board are installed
- Sewer and Water Line Hookup - After an approved rough-in inspection is obtained and the water and sewer pipes are installed, and before backfilling. If done individually, they will be listed as either Sewer Lateral or Water Lateral
- Plumbing Final- After all fixtures and equipment are installed and operational
Gas Permits and Inspections
Projects that Require a Gas Permit
Gas permits are required for the following projects:
- Removing, replacing or installing any gas appliances or equipment, including piping, gas logs, water heaters, furnaces, cooktops, ranges, or other permanently connected cooking or heating equipment connected to gas
- Installation of new propane tanks or replacing a propane tank of a different capacity or location.
When to Schedule a Gas Inspection
- Plumbing Rough Gas- After all piping that is to be concealed is installed and tested, and before the building insulation and wall board are installed
- Plumbing Final Gas - After all appliances have been installed and are operational
- Liquid Propane Tank Final - After tank and associated product lines have been installed and tested